FOR / PROCESS PLANTS

Waterproofing & Protective Coatings for Process Plants

Process plant work is protective coating engineering as much as waterproofing: containment bunds, equipment foundations, trenches, sumps and structures exposed to both weather and process chemistry. Specification is driven by chemical resistance, temperature and inspection access.

A projects or maintenance engineer at a chemical, pharmaceutical, food or utilities plant.

CONSTRAINTS

What actually makes this difficult

The technical work overlaps with every other kind of building. The constraints are what differ, and they are what a contractor either understands or does not.

Process chemistry
Resistance requirements are specific and non-negotiable.
Statutory containment
Bunds must hold their design volume and be demonstrably impermeable.
Permit-controlled work
Hot work, confined space and isolation procedures govern the method.
Inspection regimes
Linings must be testable — spark testing, thickness, adhesion.
METHOD

How we work on these projects

  • Specify against the actual process chemistry, concentration and service temperature.
  • Work strictly within your permit-to-work system.
  • Holiday and spark testing on containment linings, with records.
  • Documented dry film thickness and adhesion testing across the area.
TYPICAL SCOPE

Systems this kind of project usually needs

QUESTIONS

Process Plants — questions we get asked

How do you demonstrate a bund lining is sound?

Spark or holiday testing across the lined area to find pinholes, dry film thickness readings on a grid, and adhesion pull-off tests. All three are recorded and handed over.

Can lining work be done without a full plant shutdown?

Often it can be isolated to one bund or trench at a time. The controlling factors are ventilation, hot work restrictions and safe isolation, not the coating itself.

What if we do not know the exact chemical exposure?

Then we do not specify. Guessing at resin chemistry produces a lining that fails in service, sometimes dangerously. We ask for the datasheet or a conservative worst-case.

NEXT STEP

Talk to us about your process plant project

An engineer visits, identifies the actual source, and gives you a written scope you can act on. 40+ years of Mumbai buildings.