TOOL / READINESS

How ready is your building for the monsoon?

Twelve questions across terrace, facade, wet areas, below-grade, tanks and drainage. You get a 0–100 score and a per-area breakdown showing exactly where the building is exposed. The score appears as you answer and is never hidden behind a form — only the written report asks for your details.

THE TOOL

Twelve questions

0 of 12 answered
  1. 01Terrace & roof

    Does water drain off the terrace within a few hours of rain?

    Standing water after 24 hours means the falls are wrong.

  2. 02Terrace & roof

    Was the terrace waterproofing done or checked in the last five years?

  3. 03Terrace & roof

    Does the terrace surface sound solid when tapped, rather than hollow?

    Hollow coba means water is already travelling underneath it.

  4. 04Facade & external walls

    Is the external plaster sound, with no hollow or bulging areas?

  5. 05Facade & external walls

    Is the external paint intact, without peeling or blistering?

  6. 06Facade & external walls

    Are chajjas and projections free of cracks and rust staining?

    Chajjas fail first — they are the early warning for the whole building.

  7. 07Wet areas

    Are all bathrooms and toilets free of leaks into the flat below?

  8. 08Wet areas

    Is the tile grout in wet areas intact, without cracks or persistent damp?

  9. 09Basement & below grade

    Is the basement, stilt or lift pit dry, including after heavy rain?

  10. 10Water tanks

    Are the overhead and underground tanks free of damp on the structure around them?

  11. 11Drainage

    Are all rainwater outlets, gutters and downpipes clear and flowing?

    Blocked drainage causes more monsoon leaks than failed membranes do.

  12. 12Drainage

    Is the building free of any leak that returned after a previous repair?

    A recurring leak means the original diagnosis was wrong.

TIMING

Why May and July are not the same decision

This is chemistry rather than a sales deadline. Membranes need a dry substrate to bond to. Coatings need their full cure time before they meet standing water. Brick bat coba needs fourteen to twenty-one days of water curing, and that period cannot be compressed by adding anything to the mix.

Work booked in March or April gets all of that. Work booked in July gets a wet substrate, no curing window, and a system that looks finished at handover and fails in the second season. During the monsoon the honest scope is different — injection grouting to arrest active leaks, which works precisely because water is present, and a survey now for work that starts when the rain stops.

WHAT WE LOOK AT

The six areas this scores

  • Terrace and roof — falls, drainage, the state of the existing system, and whether it sounds hollow.
  • Facade and external walls — hollow plaster, paint condition, and the chajjas that always fail first.
  • Wet areas — leaks into flats below, and grout condition as a proxy for what is underneath.
  • Basement and below grade — whether it stays dry after heavy rain, which is the only test that matters.
  • Water tanks — damp on the structure around them, which is how tank leaks present.
  • Drainage — outlets, gutters and downpipes. Blocked drainage causes more monsoon leaks than failed membranes do.
QUESTIONS

About this score

Do I have to give my details to see the score?

No. The score and the full per-area breakdown appear as you answer, and nothing is hidden behind a form. Only the written report — the version you would put in front of a committee — asks for a name and phone number. Making you answer twelve questions and then hiding the answer would be a poor trade for your time.

What counts as a good score?

Above 80 means the building is in reasonable shape and needs maintenance rather than intervention. Between 55 and 80 means there are gaps that will widen with each monsoon. Below 55 means several areas need attention before the rains, and the risk is that water reaching reinforcement turns a waterproofing budget into a structural one.

I answered 'not sure' to several questions. Does that hurt the score?

Partly, by design. 'Not sure' scores about a third of the marks, because an unverified area is a genuine unknown rather than a pass. If several are unknown, that itself is the finding: nobody has looked at those parts of the building recently.

When should I do this?

Before the monsoon, and early enough to act on it. Membranes and coatings need a dry substrate and their full curing period, so work booked in March or April gets both. Work booked in July gets neither, and typically fails the following year.

Is the scoring transparent?

Yes. Each question carries a stated weight, the per-area breakdown shows exactly how each area scored against what was possible, and unanswered questions score zero rather than being silently excluded. You can audit the number rather than take it on trust.

NEXT STEP

Turn the score into a scope

An engineer visits, checks the areas the score flagged, and gives you a written itemised scope you can put to a general body meeting. It costs nothing.

Mon–Fri 08:00–18:00 · Sat 09:00–16:00 · Jogeshwari West

Request a callback

Phone is the only required field. We call back to arrange the inspection.